A Rowan company - serving Mission Viejo, CA

Before & After Gallery - Rowan Construction Group Mission Viejo

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Construction Before & After in Mission Viejo, CA

Photos don’t exaggerate. A kitchen with 1980s oak cabinets and a cracked tile floor either got replaced or it didn’t. We’ve delivered over 4,000 projects since 2007, and every one left with a documented photo record. What follows is how we describe the work to homeowners who are still deciding whether we’re the crew for their job.

Call (657) 297-4635

Recent Transformations

Kitchen Remodel: Galley Layout with Load-Bearing Wall Removal

Before: cramped galley kitchen with original 1980s cabinetry, fluorescent box light, and wall separating kitchen from dining area in Mission Viejo home
Before: Original 1980s galley kitchen with load-bearing wall blocking sightlines to the dining room.
After: open-concept kitchen with island, pendant lighting, and sightline through former wall location in Mission Viejo home
After: Structural beam installed flush to ceiling; island with Cambria quartz countertop; KraftMaid painted shaker cabinets.

The wall between kitchen and dining room was load-bearing, carrying roof load down to a concrete stem wall. We brought in a structural engineer, pulled the permit through Mission Viejo building department, and installed a flush LVL beam with concealed column points. The customer got a written price before we touched the drywall, including the beam spec and the cabinet line item. Under Clause 1 of the Haven Standard, that number didn’t change unless they signed a change order. They didn’t need to. The photo record shows the beam installation, the inspection sticker, and the finished soffit detail.

Bathroom Remodel: Hall Bath with Subfloor Rot and Cast Iron Tub

Before: bathroom with water-stained vinyl flooring, original cast iron tub, and visible subfloor damage around toilet flange
Before: Hall bath with spongy subfloor, original 1972 cast iron tub, and failed wax ring.
After: curbless walk-in shower with linear drain, floating vanity, and Toto fixtures in Mission Viejo bathroom
After: Curbless walk-in shower with Wedi waterproofing membrane; Toto Drake II toilet; floating Wellborn vanity.

The subfloor was 3/4-inch plywood over 2×10 joists at 16 inches on center, but the wax ring had been leaking long enough that three joist bays were punky. We cut back to solid wood, sistered the joists, and laid new 3/4-inch tongue-and-groove before the tile membrane went down. The customer brought us a competitor’s quote that didn’t mention joist sistering. We reviewed it line by line under our Free Second Opinion offer and showed them where the number would move once the rot was exposed. They hired us for the honest scope. The photo record includes the joist repair, the membrane flood test, and the final grout.

Roofing: GAF Timberline HDZ with Rotted Fascia and Inadequate Ventilation

Before: 22-year-old three-tab shingle roof with visible granule loss, cracked shingles, and water-stained fascia boards in Mission Viejo
Before: 22-year-old three-tab roof with failed shingles, rotted fascia at eaves, and 4 static vents for 2,400 square feet.
After: GAF Timberline HDZ architectural shingle roof with continuous ridge vent, new aluminum fascia, and Mission Viejo skyline
After: GAF Timberline HDZ with Golden Pledge warranty; continuous ridge vent; new .032 aluminum fascia wrap.

The existing roof had two layers of three-tab shingles over original wood shakes, which put us at the maximum allowable weight for the rafter span. We stripped to bare deck, replaced seven sheets of 1/2-inch plywood that had delaminated, and installed proper intake ventilation at the soffit. The fascia was rotted where the drip edge had pulled away; we replaced the damaged sections and wrapped with .032 aluminum. The customer received a written price that specified the shingle brand, the warranty tier, and the ventilation calculation. No surprises. The photo record shows the stripped deck, the new plywood nailing pattern, and the finished ridge vent detail.

Windows and Doors: Retrofit Vinyl with Stucco Integration

Before: original 1978 aluminum single-pane windows with failed seals, condensation between panes, and deteriorated stucco returns in Mission Viejo home
Before: Original 1978 aluminum single-pane windows with condensation, failed rollers, and cracked stucco returns.
After: Anlin Catalina vinyl retrofit windows with matching stucco texture and color in Mission Viejo home
After: Anlin Catalina vinyl retrofit windows with SunMatrix low-E; stucco returns matched to existing texture and color.

These were original 1978 aluminum single-hungs in a stucco-over-plywood exterior. Retrofit installation meant preserving the existing stucco perimeter and setting the new window into the original frame buck, which saves the stucco but demands precise shimming and sealant work. We found three windows where the plywood buck had rotted from irrigation spray; we replaced the damaged sections, applied peel-and-stick membrane, and set the new units. The written quote separated standard retrofits from the three full-frame replacements so the customer could see where the cost difference came from. The photo record shows the rotted bucks, the membrane application, and the finished stucco match.

Driveway and Pavers: Belgard Catalina Grana with Subgrade Correction

Before: cracked and settled concrete driveway with visible displacement at expansion joints, staining, and poor drainage toward garage in Mission Viejo
Before: 30-year-old concrete driveway with 4-inch displacement, reverse grade toward garage, and alligator cracking.
After: Belgard Catalina Grana paver driveway with soldier course border, permeable base, and proper drainage away from garage in Mission Viejo
After: Belgard Catalina Grana in Sierra blend; 6-inch compacted base; permeable edge restraint; grade corrected to shed water.

The concrete had settled toward the garage because the original subgrade was loose fill over a springy clay layer common in the Mission Viejo hills. We excavated 10 inches, brought in Class 2 base, and compacted in 4-inch lifts with a plate compactor and a jumping jack at the edges. The Belgard pavers went down on 1-inch bedding sand with edge restraint spiked into concrete haunch. The written price included the excavation depth, the base specification, and the paver pattern. The customer knew before we started that the grade would be corrected and the garage would stay dry. The photo record shows the excavation, the compaction lifts, and the final edge detail.

Home Addition and ADU: 480-Square-Foot Attached ADU with Kitchenette

Before: existing covered patio on concrete slab with low roof, no insulation, and no electrical or plumbing rough-in in Mission Viejo backyard
Before: Existing covered patio on 4-inch slab, uninsulated roof, no utilities; Mission Viejo ADU setback challenge.
After: completed attached ADU with full kitchenette, separate HVAC mini-split, independent electrical panel, and Mission Viejo certificate of occupancy
After: 480-square-foot attached ADU with full kitchenette, dedicated mini-split, and independent meter.

This was an existing covered patio within the required setback, which made it eligible for conversion under California ADU law but still required full compliance with Mission Viejo fire separation, egress, and energy codes. The 4-inch slab wasn’t deep enough for a kitchenette; we cut it back, trenched for plumbing and electrical, and poured a new 6-inch slab with vapor barrier and edge insulation. The written quote broke out the slab work, the kitchenette package, the mini-split, and the permit fees separately. Under the Haven Standard, no work proceeded on the upgraded quartz countertop until the customer signed the change order. The photo record documents every inspection pass, from footing to final.

Want Results Like These?

Contractor applying mortar for kitchen backsplash tile installation
Want Results Like These?

Every project here started with a phone call and a site visit. We’ll measure, photograph, and deliver a written price before any work starts. That’s Clause 1. Call (657) 297-4635 to schedule your free estimate in Mission Viejo. Bring a competitor’s quote and we’ll review it line by line at no charge.

Written by Grant Rowan, Owner at Rowan Construction Group Mission Viejo, serving Mission Viejo since 2007.

Need Construction help in Mission Viejo? Licensed & insured · Free on-site estimates response · free estimates
Call (657) 297-4635
Local Service Coverage

Request a Free Estimate in Mission Viejo

Tell us what you need - Rowan Construction Group Mission Viejo responds fast. No obligation.

When you submit this form, you acknowledge our Privacy Policy and consent to being contacted via phone, email, or SMS about your request, including by the independent contractors we may refer it to.

Prefer to text? Text Now
Call Now - 24/7 Dispatch